Generate traffic signal timing diagrams to determine green running times.

Lock Site

Lock site against any further edits. Really no more changes, this is good for ensuring anyone else using this site can not change any the details. Only use this option if you are really happy with the diagram timings.

If you want the site locked, tick the box below.

 

Edit Site Configuration

Next Steps:  << Report

 

Current Site Configuration

Site: 32/007 A406 (T) North Circular Road - A406 (T) Bowes Road - A105 Green Lanes

Phases

Phase type: Traffic.

Minimum green running time: 10

Phase type: Traffic.

Minimum green running time: 10

Phase type: Traffic.

Minimum green running time: 10

Phase type: Traffic.

Minimum green running time: 10

Phase type: Pedestrain.

Minimum green running time: 13

Post Green Time: 3

Phase type: Pedestrain.

Minimum green running time: 7

Post Green Time: 3

Phase type: Pedestrain.

Minimum green running time: 8

Post Green Time: 3

Stages

Stage 1 runs phases: A D E

Stage 2 runs phases: B C F G

Stage 3 runs phases: B C D F

Stage 4 runs phases: B D F

Intergreen table
   A   B   C   D   E   F   G 
A  X   6   6   -   -   6   9 
B  6   X   -   -   8   -   - 
C  6   -   X   -   9   -   - 
D  -   -   -   X   -   -   5 
E  -   7   7   -   X   -   - 
F  7   -   -   -   -   X   - 
G  6   -   -   7   -   -   X 
Phase Delays

Phase D  on a move from 1  to 2  delayed by 6