Generate traffic signal timing diagrams to determine green running times.

Edit Site Configuration

Next Steps:  << Diagrams

 

Current Site Configuration

Site: 32/007 A406 (T) North Circular Road - A406 (T) Bowes Road - A105 Green Lanes

Phases

Phase type: Traffic.

Minimum green running time: 10

Phase type: Traffic.

Minimum green running time: 10

Phase type: Traffic.

Minimum green running time: 10

Phase type: Traffic.

Minimum green running time: 10

Phase type: Pedestrain.

Minimum green running time: 13

Post Green Time: 3

Phase type: Pedestrain.

Minimum green running time: 7

Post Green Time: 3

Phase type: Pedestrain.

Minimum green running time: 8

Post Green Time: 3

Stages

Stage 1 runs phases: A D E

Stage 2 runs phases: B C F G

Stage 3 runs phases: B C D F

Stage 4 runs phases: B D F

Intergreen table
   A   B   C   D   E   F   G 
A  X   6   6   -   -   6   9 
B  6   X   -   -   8   -   - 
C  6   -   X   -   9   -   - 
D  -   -   -   X   -   -   5 
E  -   7   7   -   X   -   - 
F  7   -   -   -   -   X   - 
G  6   -   -   7   -   -   X 
Phase Delays

Phase D  on a move from 1  to 2  delayed by 6