Generate traffic signal timing diagrams to determine green running times.

Generate - Reports

Below are different reports, each type availabale as a pdf.

Lock site against further edits.

Edit Site Configuration

Next Steps:  << Diagrams

 

Current Site Configuration

Site: 25/048

Phases
(Faggs Rd South / Causeway)

Phase type: Traffic.

Minimum green running time: 7

(Faggs Rd North)

Phase type: Traffic.

Minimum green running time: 7

(Faggs Rd South Left G/A)

Phase type: Filter Arrow.

Minimum green running time: 3

(Faggs Rd South)

Phase type: Dummy.

Minimum green running time: 0

(The Causeway)

Phase type: Dummy.

Minimum green running time: 0

(Dummy All-Red)

Phase type: Dummy.

Minimum green running time: 3

Stages

Stage 1 runs phases: A D E

Stage 2 runs phases: B C

Intergreen table
   A   B   C   D   E   F 
A  X   7   7   -   -   3 
B  -   X   -   6   6   3 
C  -   -   X   -   -   - 
D  -   7   -   X   -   3 
E  -   7   -   -   X   3 
F  -   -   2   -   -   X 
Phase Delays

No phase delays