Generate traffic signal timing diagrams to determine green running times.

Generate - Reports

Below are different reports, each type availabale as a pdf.

Lock site against further edits.

Edit Site Configuration

Next Steps:  << Diagrams

 

Current Site Configuration

Site: 6/21

Phases

Phase type: Traffic.

Minimum green running time: 7

Phase type: Right Turn Indicative Green Arrow.

Minimum green running time: 4

Phase type: Traffic.

Minimum green running time: 7

Phase type: Traffic.

Minimum green running time: 7

Phase type: Filter Arrow.

This phase is terminated by phase: D

Minimum green running time: 4

Phase type: Pedestrain.

Minimum green running time: 6

Phase type: Traffic.

Minimum green running time: 7

Phase type: Pedestrain.

Minimum green running time: 6

Post Green Time: 3

Stages

Stage 1 runs phases: A C G

Stage 2 runs phases: A B E F G

Stage 3 runs phases: D F G

Stage 4 runs phases: C H

Stage 5 runs phases: A F G

Intergreen table
   A   B   C   D   E   F   G   H 
A  X   -   -   -   -   -   -   - 
B  -   X   -   -   -   -   -   - 
C  -   -   X   -   -   -   -   - 
D  -   -   -   X   -   -   -   - 
E  -   -   -   -   X   -   -   - 
F  -   -   -   -   -   X   -   - 
G  -   -   -   -   -   -   X   - 
H  -   -   -   -   -   -   -   X 
Phase Delays

Phase C  on a move from 4  to 3  delayed by 2  (normal) 

Phase C  on a move from 1  to 4  delayed by 7  (normal) 

Phase D  on a move from 3  to 1  delayed by 5  (normal) 

Phase D  on a move from 3  to 4  delayed by 3  (normal) 

Phase G  on a move from 3  to 4  delayed by 6  (normal)